Contract R150 – Trackwork for Bishan Depot, Ulu Pandan Depot and Pasir Ris Rail Turnback
Client: Contract R150
R150 is trackwork design and construction contract for LTA Singapore. This is a mix of brown field and green field project in existing operational depots and construction of the new Turnback track at Pasir Ris overrun.
This includes track renewal works at Bishan and Ulu Pandan Depot, Installation of new Track at Bishan Depot and Pasir Ris Turnback.